When the China Surface Pumps Manufacturers is running, measures should be taken to prevent new debris from entering the pump suction pool. Make sure that the water level in the pump suction pool is above the allowable water level. If it is less than the specified value, vortex may be generated during pump operation and air will be carried into the pump, causing unit vibration and cavitation. At this time, the submerging depth of the pump should be increased. Check the rotation of the motor (from the motor to the pump, the impeller rotates counterclockwise). The cooling and lubricating water system of the unit must supply water to the unit before the pump starts. Check the packing tightness, not too tight or too loose.
At the same time, pay attention to whether the packing gland is evenly compressed. Install the outlet pressure gauge to detect the resistance of the system, because under normal circumstances, due to system changes, it is necessary to use valves to adjust the flow and pressure. In order to obtain a safe and satisfactory operation effect, a water hammer analysis should be carried out before driving.
The use method and steps of the self-priming pump After the start-up meets the previous requirements, the unit can be started in the following order: the exhaust valve is in working condition; the main pump is started. Never start the water pump under vacuum. Since the piping system produces backflow after the shutdown, the water causes a vacuum in the pump. Before the pump is restarted, there must be sufficient time and measures to let air enter the pump to eliminate the vacuum.
When starting and running the pump, consider avoiding water hammer. In order to obtain safe and satisfactory operating results, different piping devices adopt different starting methods. Using a two-speed electric valve, the pump and the valve are started at the same time, and the valve is fully opened within 15 seconds.